A | B | C | D | |
Total time(ms) | 155 | 160 | 120 | 250 |
Initial priority | 2 | 2 | 2 | 2 |
Max period(ms) | 170 | 550 | 300 | 900 |
Solution:
N(process) = Number of time slots required
R(process) = Number of time slots remaining
Process A: N(A) = 155/100 = 1.6
R(A) = 170/101 = 1.7 R(A) ≤ N(A) + 1
Process B: N(B) = 160/100 = 1.6
R(B) = 550/101 = 5.5 R(B) ≥ N(B) + 1
Process C: N(C) = 120/100 = 1.2
R(C) = 300/101 = 3.0 R(C) ≥ N(C) + 1
Process D: N(D) = 250/100 = 2.5
R(D) = 900/101 = 9.0 R(D) ≥ N(D) + 1
Process A goes first because is priority is changed to 1
Time Slice 1
Process A: N(A) = 55/100 = 0.6
R(A) = 69/101 = 0.7 R(A) ≤ N(A) + 1
Process B: N(B) = 160/100 = 1.6
R(B) = 449/101 = 4.4 R(B) ≥ N(B) + 1
Process C: N(C) = 120/100 = 1.2
R(C) = 199/101 = 2.0 R(C) ≤ N(C) + 1
Process D: N(D) = 250/100 = 2.5
R(D) = 799/101 = 7.9 R(D) ≥ N(D) + 1
Process A and Process C have their priority changed to 1, since process A was given the previous time slot, process C goes next as the two processes now execute in Round-Robin Scheduling.
Time Slice 2
Process A: N(A) = 55/100 = 0.6
R(A) = 69/101 = 0.7 R(A) ≤ N(A) + 1
Process B: N(B) = 160/100 = 1.6
R(B) = 348/101 = 3.4 R(B) ≥ N(B) + 1
Process C: N(C) = 20/100 = 0.2
R(C) = 98/101 = 1.0 R(C) ≤ N(C) + 1
Process D: N(D) = 250/100 = 2.5
R(D) = 698/101 = 6.9 R(D) ≥ N(D) + 1
Process A goes next for the next time slice since process A and C have equal priority and process C executed in the previous time slice.
Time Slice 3
Process A: N(A) = 0/100 = 0
R(A) = 13/101 = 0.1 Finished
Process B: N(B) = 160/100 = 1.6
R(B) = 292/101 = 2.9 R(B) ≥ N(B) + 1
Process C: N(C) = 20/100 = 0.2
R(C) = 42/101 = 0.4 R(C) ≤ N(C) + 1
Process D: N(D) = 250/100 = 2.5
R(D) = 642/101 = 6.4 R(D) ≥ N(D) + 1
Process A has finished and therefore is removed from the list. Process C now becomes the only task with the highest priority and therefore goes next.
Time Slice 4
Process B: N(B) = 160/100 = 1.6
R(B) = 271/101 = 2.7 R(B) ≥ N(B) + 1
Process C: N(C) = 0/100 = 0
R(C) = 21/101 = 0.2 Finished
Process D: N(D) = 250/100 = 2.5
R(D) = 621/101 = 6.1 R(D) ≥ N(D) + 1
Process C has finished and therefore is removed from the list. Process B and D are now left, with the same priority of 2 and will be taken in round robin sequence starting with process B.
Time Slice 5
R(B) = 170/101 = 1.7 R(B) ≥ N(B) + 1
Process D: N(D) = 250/100 = 2.5
R(D) = 520/101 = 5.2 R(D) ≥ N(D) + 1
Process D goes next as both processes are taken in round robin scheduling with process B executing in the previous time slice.
Time Slice 6
Process B: N(B) = 60/100 = 0.6
R(B) = 69/101 = 0.7 R(B) ≤ N(B) + 1
Process D: N(D) = 150/100 = 1.5
R(D) = 419/101 = 4.2 R(D) ≥ N(D) + 1
Process B becomes a priority and therefore goes next.
Time Slice 7
Process B: N(B) = 0/100 = 0
R(B) = 8/101 = 0.1 Finished
Process D: N(D) = 150/100 = 1.5
R(D) = 358/101 = 3.5 R(D) ≥ N(D) + 1
Process B is completed and removed from the list. Only Process D is left and executes until completion in the next time slice.
Time Slice 8 and 9
Therefore, the full time slice diagram is given by:
Total time required for Process A:
100 + 1 + 100 + 1+ 55 = 257ms
Total time required for Process B:
100 + 1 + 100 + 1 + 55 + 1 + 20 + 1 + 100 + 1 + 100 + 1 + 60 = 541ms
Total time required for Process C:
100 + 1 + 100 + 1 + 55 + 1 + 20 = 278ms
Total time required for Process D:
100 + 1 + 100 + 1 + 55 + 1 + 20 + 1 + 100 + 1 + 100 + 1 + 60 + 1 + 100 + 1 + 50 = 693ms
Process B, C and D met their timing requirements while Process A failed to meet its maximum permitted time of 170ms.
Using round robin scheduling, the time slices are as shown
Total time required for Process A:
100 + 1 + 100 + 1+ 100 + 1 + 100 + 1 + 55 = 459ms
Total time required for Process B:
100 + 1 + 100 + 1+ 100 + 1 + 100 + 1 + 55 + 1 + 60 = 520ms
Total time required for Process C:
100 + 1 + 100 + 1+ 100 + 1 + 100 + 1 + 55 + 1 + 60 + 1+ 20 = 541ms
Total time required for Process D:
100 + 1 + 100 + 1+ 100 + 1 + 100 + 1 + 55 + 1 + 60 + 1+ 20 + 1 + 100 + 1 + 50 = 693ms
In round robin scheduling, Process B and D met their maximum permitted time while Process A and C failed to meet their timing requirements.